System planning: Difference between revisions
Mr. MacKenty (talk | contribs) (Created page with "right|frame|System Fundamentals<ref>http://www.flaticon.com/</ref> We are concerned with how systems integrate into organizations and how people use...") |
Mr. MacKenty (talk | contribs) No edit summary |
||
Line 3: | Line 3: | ||
We are concerned with how systems integrate into organizations and how people use them. I used the standards from the IB<ref>http://www.ibo.org/</ref>, but added some other topics I think fit into this category (but not included by the IB). | We are concerned with how systems integrate into organizations and how people use them. I used the standards from the IB<ref>http://www.ibo.org/</ref>, but added some other topics I think fit into this category (but not included by the IB). | ||
[[Category: | |||
== Standards == | |||
* Identify the context for which a new system is planned. [[Level 2]] | |||
* Identify the relevant stakeholders when planning a new system. [[Level 2]] | |||
== References == | |||
<references /> | |||
[[Category:System fundamentals]] |
Revision as of 11:58, 30 June 2016
We are concerned with how systems integrate into organizations and how people use them. I used the standards from the IB[2], but added some other topics I think fit into this category (but not included by the IB).
Standards[edit]
- Identify the context for which a new system is planned. Level 2
- Identify the relevant stakeholders when planning a new system. Level 2